Rules & Permits

Landed House Renovation in Singapore: Approvals, A&A and Planning

Repainting and new carpentry are one thing. Extending a terrace house is another. Here is where renovation ends, where A&A begins and who has to sign off.

Tan leather sofa with green cushions, a plant and a fireplace in a living room

A landed house renovation in Singapore can mean anything from a fresh coat of paint to adding a storey. The rules depend on which end of that range you are at. Cosmetic work is usually straightforward, but structural changes and extensions need professional involvement and approval. This guide explains the difference so you can plan the schedule, the team and the budget.

Rules are set by the Building and Construction Authority (BCA) and the Urban Redevelopment Authority (URA) and are updated from time to time. Always confirm with your Qualified Person or the authorities before you commit.

Three levels of landed home work

LevelExamplesTypical approvals
Interior renovationRepainting, new flooring, carpentry, kitchen and bathroom refreshUsually none from the authorities for purely cosmetic work
Additions and alterations (A&A)Extending a room, a rear annex, adding a storey, changing structural walls or the roofA Qualified Person submits plans to BCA, and to URA if floor area changes
RebuildDemolishing and building a new houseFull planning and building approvals

What is usually exempt

Guides commonly list these as cosmetic works that do not need BCA approval, provided no structural element is involved:

  • Hacking and retiling non-structural walls and floors
  • Kitchen and wardrobe carpentry and built-in furniture
  • Painting and wallpaper
  • Replacing flooring materials
  • Upgrading sanitary fittings without re-routing pipes

Some minor works, such as certain lightweight garden shelters and awnings, may also be exempt under building rules. Ask your Qualified Person to confirm what applies to your plans before you assume anything.

When you need a Qualified Person

If your plans involve structural changes or extensions, a Qualified Person (QP), an architect or professional engineer, must prepare and submit the plans to BCA for approval before building work starts. If the gross floor area changes, URA's planning approval is also involved. Your QP will also supervise and certify the works.

Planning a landed house renovation in Singapore

  1. Define the scope. Is this interior work, or will you touch the structure or add area? That decides the team.
  2. Appoint a QP early if you need one. Drawings and approvals take time.
  3. Choose a firm with landed experience. Multi-storey layouts, staircases, roofs and outdoor areas are different from flats. Browse landed home interior designers.
  4. Check the neighbours. In terrace and semi-detached houses, works near party walls and boundaries need care, and neighbours should be told about noisy works.
  5. Get a staged contract. Longer projects need clear milestones and staged payments. See renovation contract clauses to check.

Things to inspect before you start

  • Roof and waterproofing, including flat roofs and balconies
  • Drainage and water tanks and the condition of old pipes
  • Electrical capacity for a larger home and modern appliances
  • Termite and pest damage to timber elements
  • Boundary walls, gates and driveways

Budget and timeline

A landed house renovation in Singapore is closer to a small construction project than a flat refresh. Costs scale with floor area and with any structural work, so get itemised quotes against a clearly defined scope. Approvals can add weeks or months before building starts, and longer builds need a realistic schedule. Our renovation checklist helps you sequence the steps.

Frequently asked questions

Do I need approval to renovate a landed house in Singapore?

Purely cosmetic interior work generally does not need BCA approval, but structural changes, extensions and additions do, and they need a Qualified Person to submit the plans.

What is the difference between a renovation and A&A works?

Renovation usually means non-structural interior work. A&A (additions and alterations) means changes such as extensions, new storeys or structural alterations, which require approvals and a Qualified Person.

Does the URA need to approve my landed house works?

If the works change the gross floor area, URA's planning approval is involved as well as BCA's. Your Qualified Person can confirm what applies.

landeda&aqualified personbcauraapprovals

Ready to find a designer?

Compare Singapore interior designers and renovation firms, then get matched for free.

HDB designers Condo designers Renovation checklist