The complete Singapore renovation guide and checklist

Renovating a home in Singapore involves dozens of decisions, a handful of regulations and a lot of money. Most problems come from steps skipped or done in the wrong order. This guide walks you through the whole journey, from first budget to the end of the defects period, as a checklist you can tick off. Your progress is saved in this browser, and you can print the page.

It applies to HDB, condo and landed homes, with notes where the rules differ. Cost figures and rules change, so where we mention them we link to the detail and to the official source.

0 of 53 done

Your ticks are saved in this browser only. Nothing is sent to us.

Timeline at a glance

WhenWhat happens
3-6 months beforeBudget, brief, shortlist designers
2-3 months beforeMeet firms, compare quotes, check credentials, sign the contract
1-2 months beforePermits and approvals, final design, order long-lead items
Weeks 1-10 on siteHacking and masonry, plumbing and electrical, tiling, ceiling, painting, carpentry, fittings, cleaning
HandoverInspection, defects list, final payment on completion
Months 1-12 afterDefects liability period, seasonal checks, final inspection

1. Plan and budget

3 to 6 months before keys or works

Get clear on what you want and what you can spend before you talk to anyone. A clear brief gets you comparable quotes.

2. Choose your designer or contractor

2 to 4 months before works

The firm you pick matters more than any material. Shortlist on evidence, then check credentials yourself.

3. Contract and payments

Before you pay anything

The contract is your protection. Read every line and keep the signed copy.

4. Permits and approvals

After signing, before any works begin

Nothing that needs approval should start until approval is in hand. Breaking this rule is the fastest way to get fined.

5. Finalise the design and order early

4 to 8 weeks before works

Late decisions are the number one cause of delay. Lock the design and order slow items first.

6. During the renovation

About 8 to 12 weeks on site

Stay involved. Regular site visits catch problems while they are cheap to fix.

7. Handover inspection

Before you sign off and make the final payment

Defects found before you sign are the firm’s job to fix. After you sign they can become a negotiation. Take your time.

8. After you move in

The first 12 months

The defects liability period is your safety net. Use it.

Frequently asked questions

What should I do first when renovating in Singapore?

Set a realistic budget with a 10 to 15 percent buffer, list your must-haves, and learn the rules for your property type. Then shortlist designers and verify their credentials.

How long does a home renovation take in Singapore?

Site work often takes eight to twelve weeks, with about ten weeks a common benchmark, plus planning, permits and ordering time beforehand. A lighter scope can be shorter.

What should I check at handover?

Test every tap, switch, socket, door and cabinet, inspect tiles, paint and silicone, write a signed defects list with fix dates, and hold back the final payment until it is cleared.

What is a defects liability period?

It is the agreed period after handover during which the contractor must fix workmanship defects. It is commonly around 12 months, and your contract should state it.

Do I need a permit to renovate?

For HDB flats, works such as hacking need an HDB renovation permit that your registered contractor applies for. Condos require management corporation approval. Ask your firm which approvals your plans need.

Find a designer you can check

Compare Singapore interior designers and renovation firms, filter by HDB licence and CaseTrust credentials, then get matched for free.

Browse designers Get matched